2016
No. |
Start date |
Date of decision |
Subject |
1. |
13-04-2016 |
27-04-2016 |
Approval of the per diems and travel arrangements to be financed from the Technical Assistance budget |
2. |
22-07-2016 |
08-08-2016 |
Confirmation of the JTS seat in Warsaw (Poland) and creation of the new Branch Office in Rzeszów (Poland) |
3. |
09-08-2016 |
19-08-2016 |
Modifications of the Joint Operational Programme |
4. |
11-08-2016 |
18-08-2016 |
Time schedule of the calls for proposals and the application pack documents for the 1st call for proposals and large infrastructure projects |
5. |
29-08-2016 |
05-09-2016 |
Approval of tender dossiers for the service contracts to be operational in 2017 |
6. |
21-09-2016 and 30-09-2016 |
05-10-2016 |
Approval of the modified version of JOP |
7. |
26-09-2016 |
07-10-2016 |
Approval of “The Programme Manual Part I – Applicant. 1st Call for proposals” |
8. |
15-11-2016 and 07-12-2016 |
13-12-2016 |
Approval of the modified version of JOP |
2017
No. |
Start date |
Date of decision |
Subject |
1. |
03-01-2017 |
17-01-2017 |
Approval of LIP Project Summaries |
2. |
14-02-2017 |
21-02-2017 |
Approval of PSC Rules of procedures |
3. |
02-03-2017 |
03-03-2017 |
Appointment of the Project Selection Committee composition |
4. |
07-03-2017 |
07-03-2017 |
Appointment of the Project Selection Committee composition |
5. |
08-03-2017 |
13-03-2017 |
Approval of the first Annual Implementation Report |
6. |
11-03-2017 |
14-03-2017 |
Approval of modifying certain assumptions of the first call for proposals |
7. |
28-04-2017 |
09-05-2017 |
Approval of modifying certain assumptions of the first call for proposals |
8. |
26-05-2017 |
01-06-2017 |
Approval of Guidelines for expenditure verification |
9. |
26-05-2017 |
02-06-2017 |
Approval of the Programme annual plan of events |
10. |
01-06-2017 |
08-06-2017 |
Approval of pool of assessors |
11. |
28-06-2017 |
04-07-2017 |
Approval of the updated TA overall budget and the updated Annex II which shall modify the on-going service contract with the Branch Office in Lviv |
12. |
01-06-2017 |
08-06-2017 |
Approval of pool of assessors |
13. |
28-06-2017 |
04-07-2017 |
Approval of the updated TA overall budget |
14. |
21-07-2017 |
31-07-2017 |
Approval of the implementation documents |
15 |
25-07-2017 |
01-08-2017 |
Approval of the pool of State Aid Experts |
16 |
09-08-2017 |
16-08-2017 |
Approval of the pool of State Aid Experts |
17 |
25-08-2017 |
08-09-2017 |
Approval of amended LIP Application and Implementation Process |
18 |
31-08-2017 |
07-09-2017 |
Approval of tender dossiers for the service contracts to be operational in 2018-2021 |
19 |
04-09-2017 |
11-09-2017 |
LIP Full Application Forms - 1 package |
20 |
12-09-2017 |
14-09-2017 |
Approval of updated composition of the Project Selection Committtee |
21 |
16-10-2017 |
23-10-2017 |
Approval of Annual Implementation Report for 2016 |
22 |
19-10-2017 |
25-10-2017 |
LIP Full Application Form LIP/0008, LIP/0006 |
23 |
20-10-2017 |
27-10-2017 |
Approval of changes in TA budget of the ENPI Programme |
24 |
31-10-2017 |
07-11-2017 |
Approval of minutes from the second JMC meeting |
25 |
13-11-2017 |
15-11-2017 |
Appointment of the Project Selection Committee composition |
26 |
14-11-2017 |
21-11-2017 |
LIP Full Application Form LIP/0010 |
27 |
21-11-2017 |
28-11-2017 |
LIP Full Application Form LIP/0018 |
28 |
29-11-2017 |
04-12-2017 |
Approval of MA TA budget |
29 |
04-12-2017 |
11-12-2017 |
Approval of the Grant Contract template |
30 |
19-12-2017 |
27-12-2017 |
Approval of minutes from the third JMC meeting in Lviv |
31 |
12-12-2017 |
18-12-2017 |
Approval of the Full Application Forms of the LIP/0015/16 |
2018
No. |
Start date |
Date of decision |
Subject |
1. | 25-01-2018 | 31-01-2018 | Approval of updated TA documents and new ToRs for BOs in Lviv and Brest |
2. | 25-01-2018 | 31-01-2018 | Approval of amended Guidelines for expenditure verification |
3. | 01-02-2018 | 09-02-2018 | Approval of the second Annual Implementation Report |
4. | 14-02-2018 | 16-02-2018 | Approval of updated composition of the Project Selection Committtees |
5. | 26-02-2018 | 01-03-2018 | Approval of updated composition of the Project Selection Committtees |
6. | 28-02-2018 | 06-03-2018 | Approval of changes in project PBU1/0090/16 |
7. | 05-03-2018 | 05-03-2018 | Approval of updated composition of PSC |
8. | 13-03-2018 | 16-03-2018 | Approval of changes in the project PBU1/0667/16 |
9. | 30-03-2018 | 06-04-2018 | Approval of the minutes - 4th JMC meeting, Bialystok, 22.03.2018 |
10. | 18-05-2018 | 22-05-2018 | Approval of setting a final deadline - TO HERITAGE |
11. | 24-05-2018 | 01-06-2018 | Approval of introduction of significant changes in projects No.PBU1/0205/16, PBU1/0206/16 and PBU1/0239/16 |
12. | 28-05-2018 | 04-06-2018 | Approval of TA documents |
13. | 15-06-2018 | 09-07-2018 | Approval of changes in the project PBU1/0195/16 |
14. | 27-07-2018 | 03-08-2018 | Approval of changes in the projects No. PBU1/0205/16, PBU1/0206/16 and PBU1/0239/16 |
15. | 08-08-2018 | 16-08-2018 | Approval of changes in the project no PBU1/0320/16 |
16. | 27-08-2018 | 31-08-2018 | Approval of Annual Implementation Report for the year 2017 |
17. | 29-08-2018 | 05-09-2018 | Approval of waving the interests on late payment in PBU 07-13 |
18. | 11-09-2018 | 18-09-2018 | Approval of modifications of ENPI and ENI documents |
19. | 18-09-2018 | 25-09-2018 | Approval of modified "Programme Manual Part I – Applicant" |
20. | 02-10-2018 | 05-10-2018 | Approval of PSC Rules of procedures for the 2nd CfP |
21. | 08-10-2018 | 15-10-2018 | Approval of changes in the project PLBU.01.01.00-20-0368/17-00 |
22. | 15-10-2018 | 22-10-2018 | Approval of changes in the project PBU1/0511/16 |
23. | 18-10-2018 | 25-10-2018 | Approval of changes in the project PLBU.03.01.00-BY-0766/17-00 |
24. | 23-10-2018 | 29-10-2018 | Approval of changes in the project PBU1/0216/16 |
25. | 04-12-2018 | 10-12-2018 | Approval of changes in the project No PLBU.01.01.00-20-0599/17-00 |
26. | 11-12-2018 | 18-12-2018 | Approval of changes in the project PLBU.02.02.00-14-0594/17-00 |
2019
No. |
Start date |
Date of decision |
Subject |
1. | 07-01-2019 | 14-01-2019 | Approval of changes in the project PLBU.01.02.00-20-0224/17-00 |
2. | 11-02-2019 | 14-02-2019 | Approval of changes in the project PBU1/0754/16 |
3. | 11-02-2019 | 18-02-2019 | Approval of changes to service contracts and expenditure verification procedure for service contracts |
4. | 13-02-2019 | 18-02-2019 | Approval of the Annual Report of the Programme 2014-2020 (01.07.2017 - 30.06.2018) |
5. | 13-02-2019 | 20-02-2019 | Approval of changes in the project PLBU.01.01.00-20-0071/17-00 |
6. | 13-02-2019 | 20-02-2019 | Approval of changes in the project PLBU.02.01.00-20-0463/17-00 |
7. | 15-02-2019 | 22-02-2019 | Approval of changes in the project PLBU.04.02.00-BY-0629/17-00 |
8. | 25-02-2019 | 28-02-2019 | Appointment of the Project Selection Committee composition - 2nd CfP |
9. | 10-04-2019 | 15-04-2019 | Approval of changes in TA budget of the ENPI Programme |
10. | 17-04-2019 | 24-04-2019 | Approval of the 5th JMC Meeting minutes |
11. | 10-05-2019 | 17-05-2019 | Approval of changes in the project No PBU1/0376/16 |
12. | 16-05-2019 | 23-05-2019 | Approval of changes in the project PLBU.01.01.00-14-0658/17-00 |
13. | 04-06-2019 | 11-06-2019 | Approval of changes in the project PLBU.02.01.00-20-0039/17-00 |
14. | 06-06-2019 | 13-06-2019 | Approval of modification of the Programme Manual part I |
15. | 07-06-2019 | 12-06-2019 | Approval of modification of the PBU2 documents: Grant Contract, Partnership Agreement and Programme Manual |
16. | 13-06-2019 | 20-06-2019 | Approval of modifications to the Guidelines on Expenditure Verification with Annexes |
17. | 24-06-2019 | 27-06-2019 | Approval of the Final Implementation Report of the Programme 2007-2013 |
18. | 12-08-2019 | 19-08-2019 | Approval of the Guide on procurement rules applicable for service contracts |
19. | 05-09-2019 | 12-09-2019 | Approval of changes in the project PBU2/0802/18 (micro) |
20. | 11-09-2019 | 17-09-2019 | Approval of the JPC Rules of Procedures - the 2021-2027 Interreg Poland-Belarus-Ukraine Programme |
21. | 25-09-2019 | 02-10-2019 | Approval of changes in the project PLBU.02.01.00-06-0004/17-00 |
22. | 17-10-2019 | 22-10-2019 | Approval of the Application Pack documents for the 3rd Call for Proposals |
23. | 25-10-2019 | 04-11-2019 | Approval of the Final Implementation Report of the Programme 2007-2013 |
24. | 28-10-2019 | 31-10-2019 | Approval of complementing the Programme Manual for the 2nd Call for Proposals |
25. | 04-11-2019 | 11-11-2019 | Approval of changes in the project no. PBU2/0786/18 |
26. | 07-11-2019 | 14-11-2019 | Approval of changes in the project no. PBU2/0912/18 |
27. | 15-11-2019 | 22-11-2019 | Approval of changes in the project PLBU.01.02.00-BY-0750/17-00 |
28. | 19-11-2019 | 26-11-2019 | Approval of changes in the projects PLBU.04.01.00-06-0505/17-00 and PLBU.04.01.00-06-0506/17-00 |
29. | 19-11-2019 | 28-11-2019 | Approval of the changes in the project PBU2/0873/18 |
30. | 26-11-2019 | 29-11-2019 | Approval of changes in the project PBU2/0900/18 |
31. | 28-11-2019 | 03-12-2019 | Approval of changes in the project PBU2/0961/18 |
32. | 29-11-2019 | 06-12-2019 | Approval of changes in the Programme Manual part II |
33. | 03-12-2019 | 06-12-2019 | Approval of changes in the project PBU2/0928/18 |
34. | 05-12-2019 | 10-12-2019 | Approval of changes in the project PBU2/0977/18 |
35. | 16-12-2019 | 23-12-2019 | Approval of the Accommodation & Travel Arrangements for Service Contracts |
2020
1. | 23-12-2019 | 03-01-2020 | Approval of next changes in the project No. PLBU.02.01.00-20-0039/17-00 |
2. | 17-01-2020 | 22-01-2020 | Approval of changes in the project No. PLBU.01.02.00-20-0832/19-00 |
3. | 23-01-2020 | 30-01-2020 | Approval of changes in the LIP project No. PLBU.03.01.00-UA-0010/17-00 |
4. | 31-01-2020 | 07-02-2020 | Approval of the Annual Report of the ENI CBC Poland-Belarus-Ukraine Programme 2014-2020 for the period 1.07.2018 - 30.06.2019 |
5. | 07-02-2020 | 12-02-2020 | Approval of the change in the project No. PBU2/0929/18 |
6. | 07-02-2020 | 14-02-2020 | Approval of changes in the project No. PLBU.01.01.00-20-0824/19-00 |
7. | 11-02-2020 | 14-02-2020 | Approval of changes in the project No. PBU2/1009/18 |
8. | 06-03-2020 | 11-03-2020 | Changes in the project No. PLBU.02.01.00-14-0104/17-01 - project prolongation |
9. | 11-03-2020 | 18-03-2020 | Approval a modified version of the overall TA budget of the Programme together with modified TA sheets |
10. | 25-03-2020 | 27-03-2020 | Approval of Supplement to Programme Manuals and Guidelines on expenditure verification regarding situation caused by COVID-19 |
11. | 31-03-2020 | 03-04-2020 | Approval of changes in the PBU Programme Manual Part I |
12. | 07-04-2020 | 10-04-2020 | Extention of project No. PLBU.02.01.00-18-0667/17-00 |
13. | 10-04-2020 | 17-04-2020 | Modification of the Auditors' Guidelines on expenditure verification |
14. | 15-04-2020 | 21-04-2020 | Approval of changes in the project No. PLBU.01.01.00-18-0307/17-00 |
15. | 16-04-2020 | 22-04-2020 | Prolongation of the project No. PLBU.02.01.00-18-0098/17-00 |
16. | 16-04-2020 | 22-04-2020 | Prolongation of the project No. PLBU.02.01.00-06-0056/17-00 |
17. | 21-04-2020 | 24-04-2020 | Approval of allocation of Programme savings to increase response to the COVID crisis situation within TO Security healthcare projects |
18. | 22-04-2020 | 27-04-2020 | Approval of changes in the project No. PLBU.03.01.00-18-0668/17-00 |
19. | 30-04-2020 | 06-05-2020 | Prolongation of the project No. PLBU.04.02.00-06-0433/17-00 |
20. | 04-05-2020 | 07-05-2020 | Approval of changes in the project No. PLBU.01.01.00-20-0856/19-00 |
21. | 05-05-2020 | 08-05-2020 | Approval of changes in the project No. PLBU.01.01.00-20-0771/19-00 |
22. | 05-05-2020 | 08-05-2020 | Approval of changes in the project No. PLBU.01.01.00-14-0909/19-00 |
23. | 05-05-2020 | 08-05-2020 | Approval of changes in the project No. PLBU.01.01.00-UA-0925/19-00 |
24. | 07-05-2020 | 12-05-2020 | Approval of change in the project No. PLBU.01.02.00-06-0861/19-00 |
25. | 11-05-2020 | 15-05-2020 | Approval of changes in the project No. PLBU.01.01.00-20-0985/19-00 |
26. | 21-05-2020 | 26-05-2020 | Approval of changes in the project No. PLBU.01.02.00-18-0969/19-00 |
27. | 21-05-2020 | 26-05-2020 | Approval of changes in the project No. PLBU.01.01.00-00-0807/19 |
28. | 25-05-2020 | 28-05-2020 | Approval of changes in the project No. PLBU.01.01.00-18-0945/19 |
29. | 25-05-2020 | 28-05-2020 | Appointment of the members and observers of the Project Selection Committee - 3rd CfP |
30. | 28-05-2020 | 02-06-2020 | Approval of prolongation of the project No. PLBU.04.02.00-20-0062/17-00 |
31. | 29-05-2020 | 03-06-2020 | Approval of changes in the project No. PLBU.02.01.00-14-0104/17-02 - project prolongation |
32. | 01-06-2020 | 04-06-2020 | Approval of changes in the project No. PLBU.01.02.00-20-0920/19-00 |
33. | 09-06-2020 | 15-06-2020 | Approval of extension of the project no. PLBU.03.02.00-06-0591/17-01 |
34. | 15-06-2020 | 18-06-2020 | Approval of anti Covid-19 modification - project No. PLBU.03.01.00-06-0142/17-00 |
35. | 18-06-2020 | 23-06-2020 | Approval of framework procedure of introducing the COVID-19 epidemic related changes in the PBU projects |
36. | 23-06-2020 | 26-06-2020 | Approval of changes in the project No. PLBU.03.01.00-06-0041/17-01 i.e. anti Covid-19 and other project modification |
37. | 01-07-2020 | 06-07-2020 | Approval of final results of the 3rd Call for Proposals project selection process |
38. | 10-07-2020 | 15-07-2020 | Approval of project No. PLBU.03.01.00-BY-0766/17-00, - anti COVID-19 and other modifications |
39. | 13-07-2020 | 16-07-2020 | Approval of project No. PLBU.03.01.00-20-0326/17-00, - anti COVID-19 and other modifications |
40. | 13-07-2020 | 16-07-2020 | Approval of update of the PBU Programme documents in regards to the changes of the UA public procurement |
41. | 23-07-2020 | 27-07-2020 | Approval of changes in the project No. PLBU.03.01.00-14-0067/17-00, - anti COVID-19 and other project modification |
42. | 24-07-2020 | 29-07-2020 | Approval of modified templates of PBU Beneficiaries’ financial reports |
43. | 24-07-2020 | 29-07-2020 | Approval of changes in the project No. PLBU.02.01.00-UA-0697/17-00 |
44. | 31-07-2020 | 03-08-2020 | Approval of changes in the project No. PLBU.01.01.00-UA-0746/17-00 |
45. | 04-08-2020 | 11-08-2020 | Approval of changes in the project No. PLBU.04.01.00-BY-0683/17-00 |
46. | 05-08-2020 | 10-08-2020 | Approval of changes in the project No. PLBU.04.02.00-BY-0629/17-00 |
47. | 21-08-2020 | 26-08-2020 |
Approval of changes in the project No. PLBU.03.01.00-18-0668/17-000, - anti COVID-19 and other project modification |
48. | 26-08-2020 | 31-08-2020 | Prolongation and changes in the project No. PLBU.02.01.00-18-0340/17-00 |
49. | 08-09-2020 | 11-09-2020 | Prolongation and changes in the project No. PLBU.01.01.00-18-0833/19-00 |
50. | 01-10-2020 | 06-10-2020 | Approval of changes in the project Addendum PLBU.02.01.00-18-0001/17-01 |
51. | 01-10-2020 | 06-10-2020 | Approval of changes in the project No. PLBU.03.01.00-20-0266/17-00, - anti COVID-19 and other project modifications |
52. | 01-10-2020 | 06-10-2020 | Approval of changes in the project No. PLBU.02.01.00-14-0003/17-00 |
53. | 05-10-2020 | 08-10-2020 | Approval of changes in the project No. PLBU.01.02.00-06-0914/19 |
54. | 07-10-2020 | 12-10-2020 | Approval of changes in the project No. PLBU.03.01.00-06-0063/17-00, - anti COVID-19 project modification |
55. | 07-10-2020 | 12-10-2020 | Approval of changes in the project No. PLBU.04.02.00-BY-0015/17-00 |
56. | 08-10-2020 | 13-10-2020 | Approval of changes in the project No. PLBU.01.01.00-06-0968/19-00 |
57. | 08-10-2020 | 16-10-2020 | Approval of change in the settlement of the infrastructure component in micro-projects (PBU2 and PBU3) |
58. | 19-10-2020 | 22-10-2020 | Approval of changes in the project No. PLBU.03.01.00-20-0268/17-00 |
59. | 30-10-2020 | 06-11-2020 | Approval of the possibility of financing up to 100% of the total eligible costs of the 12 PBU healthcare projects |
60. | 04-11-2020 | 09-11-2020 | Approval of changes in the LIP project No. PLBU.03.02.00-BY-0006/17-00 |
61. | 09-11-2020 | 14-11-2020 | Approval of modification of the Information and Communication Plan of the PBU Programme for 2020 |
62. | 25-11-2020 | 02-12-2020 | Approval of updated version of the Joint Operational Programme (4th revision) |
63. | 11-12-2020 | 16-12-2020 | Approval of changes in the project No. PLBU.01.01.00-UA-0807/19 |
64. | 11-12-2020 | 16-12-2020 | Approval of minutes of the 6th PBU JMC meeting + presentations |
65. | 17-12-2020 | 22-12-2020 | Approval of modification of annex 11 to the Guidelines on expenditure verification |
2021
No. |
Start date |
Date of decision |
Subject |
1. | 28-12-2020 | 05-01-2021 | Approval of updated versions of the LIP&PBU1 and PBU2&PBU3 Programme Manuals |
2. | 30-12-2020 | 07-01-2021 | Changes in the project No. PLBU.04.02.00-UA-0205/17-00, change of project beneficiary |
3. | 30-12-2020 | 07-01-2021 | Approval of changes in the project No. PLBU.04.02.00-UA-0240/17-00, i.e. change of the project beneficiary |
4. | 13-01-2021 | 15-01-2021 | Approval of changes in the project No. PLBU.03.02.00-UA-0008/17-00, i.e. prolongation up to 38 months |
5. | 25-01-2021 | 01-02-2021 | Approval of changes in TA budget of the ENI PL-BY-UA 2014-2020 Programme |
6. | 26-01-2021 | 29-01-2021 | Changes in the project No. PLBU.03.01.00-18-0358/17-00, i.e. anti Covid-19 project modification |
7. | 05-02-2021 | 10-02-2021 | Approval of the Annual Report of the ENI CBC Poland-Belarus-Ukraine Programme 2014-2020 for the period 1.07.2019 - 30.06.202 |
8. | 25-02-2021 | 02-03-2021 | Approval of changes in the project PLBU.01.01.00-20-0794/19 |
9. | 09-03-2021 | 23-03-2021 | Approval of waiver of recovery for the ENPI Cross-border Cooperation Programme Poland-Belarus-Ukraine 2007-2013 projects (receivables up to EUR 30,000) |
10. | 27-04-2021 | 30-04-2021 | Approval of changes in the project PLBU.01.01.00-UA-0804/19-00 |
11. | 29-04-2021 | 06-05-2021 | Approval of changes in the project PBU3/1121/20 |
12. | 05-05-2021 | 12-05-2021 | Approval of changes in the project PLBU.01.01.00-18-1029/20 |
13. | 05-05-2021 | 12-05-2021 | Approval of changes in the project PLBU.01.02.00-20-0920/19-00 |
14. | 11-05-2021 | 18-05-2021 | Approval of changes in the project PLBU.01.01.00-20-0856/19-00 |
15. | 02-06-2021 | 08-06-2021 | Approval of changes in the project no PLBU.01.01.00-06-0912/19-00 |
16. | 15-06-2021 | 18-06-2021 | Approval of changes in the project no PLBU.01.01.00-06-0791/19-00 |
17. | 16-06-2021 | 21-06-2021 | Approval of changes in the project PLBU.02.01.00-18-0667/17-00 |
18. | 16-06-2021 | 21-06-2021 | Approval of changes in the project PLBU.01.02.00-18-0677/17-00 |
19. | 16-06-2021 | 21-06-2021 | Approval of changes in the project PLBU.01.01.00-06-0880/19 |
20. | 23-06-2021 | 25-06-2021 | Approval of changes in the project PLBU.01.02.00-20-0224/17-00 |
21. | 23-06-2021 | 25-06-2021 | Approval of changes in the project PLBU.03.01.00-UA-0018/17-00 |
22. | 23-06-2021 | 25-06-2021 | Approval of changes in the project PLBU.03.01.00-UA-0018/17-00 |
23. | 24-06-2021 | 29-06-2021 | Approval of changes in the project PLBU.01.01.00-BY-0976/19-00 |
24. | 24-06-2021 | 29-06-2021 | Approval of changes in the project PLBU.01.02.00-18-0969/19-00 |
25. | 02-07-2021 | 07-07-2021 | Approval of changes in the service contract PLBU.05.01.00-BY-0004/17-00 |
26. | 02-07-2021 | 07-07-2021 | Approval of changes in the project PLBU.01.02.00-BY-0977/19-00 |
27. | 22-07-2021 | 26-07-2021 | Approval of changes in the project PLBU.01.01.00-UA-0461/17-00 |
28. | 04-08-2021 | 09-08-2021 | Approval of changes in the project PLBU.01.01.00-UA-0804/19-00 |
29. | 06-08-2021 | 20-08-2021 | Approval of PBU 2021-2027 budget division |
30. | 10-08-2021 | 20-08-2021 | Approval of PBU 2021-2027 Programme document after consult., LIPs and branding |
31. | 17-08-2021 | 20-08-2021 | Approval of changes in the project PLBU.01.02.00-BY-0750/17-00 |
32. | 18-08-2021 | 23-08-2021 | Approval of changes in the project PLBU.01.01.00-18-0365/17-00 |
33. | 26-08-2021 | 31-08-2021 | Approval of changes in the project PLBU.01.01.00-UA-0929/19-00 |
34. | 26-08-2021 | 31-08-2021 | Approval of changes in the project PLBU.03.01.00-18-0358/17-00 |
35. | 27-08-2021 | 01-09-2021 | Approval of changes in the project PLBU.03.01.00-06-0142/17-00 |
36. | 01-09-2021 | 06-09-2021 | Approval of changes in the project PLBU.01.01.00-18-0307/17-00 |
37. | 03-09-2021 | 08-09-2021 | Approval of changes in the project PLBU.01.01.00-20-0794/19-00 |
38. | 10-09-2021 | 15-09-2021 | Approval of changes in the project PLBU.01.02.00-18-0469/17-00 |
39. | 15-09-2021 | 20-09-2021 | Approval of changes in the project PLBU.02.01.00-18-0340/17-00 |
40. | 15-09-2021 | 20-09-2021 | Approval of update of the Guidelines on Expenditure Verification version 6 |
41. | 16-09-2021 | 21-09-2021 | Approval of changes in the project PLBU.01.01.00-20-0856/19-00 |
42. | 16-09-2021 | 21-09-2021 | Approval of changes in the project PLBU.01.02.00-UA-0927/19-00 |
43. | 17-09-2021 | 22-09-2021 | Approval of changes in the project PLBU.01.02.00-06-0211/17-00 |
44. | 20-09-2021 | 23-09-2021 | Approval of changes in the project PLBU.02.01.00-18-0668/17-00 |
45. | 21-09-2021 | 24-09-2021 | Approval of changes in the project PLBU.02.01.00-18-0667/17-00 |
46. | 21-09-2021 | 24-09-2021 | Approval of changes in the project PLBU.01.02.00-18-0677/17-00 |
47. | 08-10-2021 | 13-10-2021 | Approval of changes in the project PLBU.01.01.00-UA-0974/19-00 |
48. | 08-10-2021 | 13-10-2021 | Approval of changes in the project PLBU.03.01.00-14-0376/17-00 |
49. | 15-10-2021 | 20-10-2021 | Approval of changes in the project PLBU.01.01.00-BY-0988/19-00 |
50. | 22-10-2021 | 27-10-2021 | Approval of changes in the project PLBU.01.01.00-18-0945/19-00 |
51. | 28-10-2021 | 03-11-2021 | Approval of changes in the service contract PLBU.05.01.00-UA-0001/17-00 |
52. | 04-11-2021 | 12-11-2021 | Approval of the extension of the framework procedure to introduce the COVID-19 epidemic related changes in the PBU projects |
53. | 09-11-2021 | 19-11-2021 | Approval of cancelation of the decision on financing of the PBU1/0499/16 project within the Programme |
54. | 19-11-2021 | 26-11-2021 | Approval of termination of further contracting of the reserve list micro-projects and to limit allocation |
55. | 30-11-2021 | 03-12-2021 | Approval of changes in the service contract PLBU.05.01.00-BY-0002/17-00 |
56. | 03-12-2021 | 08-12-2021 | Approval of changes in the project PLBU.01.01.00-18-1189/20 |
57. | 07-12-2021 | 10-12-2021 | Approval of changes in the service contract PLBU.05.01.00-18-0003/17-00 |
58. | 07-12-2021 | 10-12-2021 | Approval of changes in the project PLBU.01.02.00-20-0920/19-00 |
59. | 08-12-2021 | 14-12-2021 | Approval of changes in the TA budget of the ENI Programme PL-BY-UA 2014-2020 |
60. | 16-12-2021 | 21-12-2021 | Approval of changes in the project PLBU.01.02.00-20-0224/17-00 |
61. | 30-12-2021 | 04-01-2022 | Approval of the update of the PBU Guidelines on Expenditure Verification annexes (checklists) |
62. | 12-01-2022 | 17-01-2022 | Approval of changes in the project no PLBU.01.02.00-BY-0928/19-00 |
2022
No. | Start date | Date of decision | Subject |
1. | 12-01-2022 | 17-01-2022 | Approval of changes in the project no. PLBU.01.02.00-BY-0928/19-00 |
2. | 11-02-2022 | 15-02-2022 | Approval of the Annual Report of the ENI CBC Poland-Belarus-Ukraine Programme 2014-2020 for the period 1.07.2020 - 30.06.2021 |
3. | 04-03-2022 | 10-03-2022 | Approval of changes within TA budget for the PBU 2014-2020 Programme |
4. | 16-03-2022 | 21-03-2022 | Approval of changes in the project no. PLBU.01.02.00-18-0677/17-00 |
5. | 22-03-2022 | 25-03-2022 | Approval of extension of the framework procedure to introduce the COVID-19 epidemic and the invasion of Ukraine related changes in the PBU projects |
6. | 25-03-2022 | 28-03-2022 | Approval of the next update of the PBU Guidelines on Expenditure Verification |
7. | 30-03-2022 | 04-04-2022 | Approval of changes in the project no. PBU1/0499/16 |
8. | 15-04-2022 | 21-04-2022 | Approval of changes in the project no. PLBU.01.01.00-18-0945/19 |
9. | 06-05-2022 | 11-05-2022 | Approval of changes in the project no. PLBU.01.01.00-18-0307/17-00 - prolongation of the project |
10. | 10-05-2022 | 13-05-2022 | Approval of Supplement to the Programme Manuals related to suspension of the Financing Agreement and of template of Subsidiary Contract |
11. | 20-05-2022 | 25-05-2022 | Approval of changes in the project no. PLBU.01.01.00-UA-0746/17-00 - prolongation of the project |
12. | 20-05-2022 | 25-05-2022 | Approval of changes in the project no. PLBU.01.01.00-UA-0461/17-00 prolongation of the project |
13. | 27-05-2022 | 01-06-2022 | Approval of changes in the project no. PLBU.03.01.00-UA-0018/17-00 - prolongation of the project |
14. | 02-06-2022 | 07-06-2022 | Approval of changes in the project no. PLBU.01.02.00-20-1002/19 |
15. | 03-06-2022 | 08-06-2022 | Approval of the next update of the PBU Guidelines on Expenditure Verification |
16. | 15-06-2022 | 21-06-2022 | Approval of changes in the project no. PLBU.01.01.00-20-1036/20-00 |
17. | 22-06-2022 | 27-06-2022 | Approval of changes in the project no. PLBU.03.01.00-18-0358/17-00 |
18. | 24-06-2022 | 29-06-2022 | Approval of changes in the project no. PLBU.03.01.00-14-0376/17-00 |
19. | 24-06-2022 | 29-06-2022 | Approval of changes in the project no. PLBU.01.01.00-14-0909/19-00 |
20. | 24-06-2022 | 29-06-2022 | Approval of changes in the project no. PLBU.01.02.00-18-0469/17-00 |
21. | 29-06-2022 | 01-07-2022 | Approval of changes in the project no. PLBU.01.02.00-18-0677/17-00 |
22. | 29-06-2022 | 01-07-2022 | Approval of changes in the project no. PLBU.03.01.00-UA-0010/17-00 |
23. | 29-06-2022 | 01-07-2022 | Approval of changes in the project no. PLBU.01.02.00-20-0224/17-00 |
24. | 05-07-2022 | 08-07-2022 | Approval of next changes of the update of the PBU Guidelines on Expenditure Verification |
25. | 05-07-2022 | 11-07-2022 | Approval of changes in the project no. PLBU.03.01.00-18-0668/17-00 |
26. | 06-07-2022 | 11-07-2022 | Approval of changes in the project no PLBU.02.01.00-18-0340/17-00 |
27. | 05-08-2022 | 10-08-2022 | Approval of changes in the project no. PLBU.01.01.00-18-0307/17-00 - additional actions supporting Ukraine and Ukrainians |
28. | 09-08-2022 | 12-08-2022 | Approval of changes in the project no. PLBU.01.02.00-06-0211/17-00 - additional actions supporting Ukraine and Ukrainians |
29. | 24-08-2022 | 29-08-2022 | Approval of the next update of the Programme Manual - part I (regular projects) |
30. | 29-08-2022 | 01-09-2022 | Approval of changes in the LIP project no. PLBU.03.02.00-UA-0008/17-00 (prolongation) |
31. | 31-08-2022 | 05-09-2022 | Approval of changes in the project no. PLBU.01.01.00-14-0658/17-00 - additional actions supporting Ukraine and Ukrainians |
32. | 01-09-2022 | 06-09-2022 | Approval of changes in the project no. PLBU.01.01.00-18-0499/17-00 |
33. | 01-09-2022 | 06-09-2022 | Approval of changes in the project no. PLBU.01.01.00-06-0195/17-00 - additional actions supporting Ukraine and Ukrainians |
34. | 01-09-2022 | 06-09-2022 | Approval of changes in the project no. PLBU.01.02.00-BY-0928/19-00 |
35. | 02-09-2022 | 07-09-2022 | Approval of changes in the project no. PLBU.03.02.00-UA-0754/17-00 - project prolongation |
36. | 06-09-2022 | 09-09-2022 | Approval of changes in the project no. PLBU.01.01.00-UA-1055/20 |
37. | 07-09-2022 | 12-09-2022 | Approval of changes in the project no. PLBU.01.02.00-18-0677/17-00 - additional actions supporting Ukraine and Ukrainians |
38. | 12-09-2022 | 15-09-2022 | Approval of changes in the project no. PLBU.03.01.00-06-0217/17-00 - additional actions supporting Ukraine and Ukrainians |
39. | 16-09-2022 | 21-09-2022 | Approval of changes in the project no. PLBU.01.01.00-20-1045/20 |
40. | 16-09-2022 | 21-09-2022 | Approval of the changes in the project no. PLBU.01.01.00-UA-0461/17-00 - prolongation of the project |
41. | 22-09-2022 | 27-09-2022 | Approval of the changes in the large infrastructural project no. PLBU.03.01.00-UA-0018/17-00, i.e. prolongation of the project |
42. | 24-10-2022 | 27-10-2022 | Approval of the changes in the project PLBU.03.01.00-18-0358/17-00 - additional actions supporting Ukraine and Ukrainians |
43. | 28-10-2022 | 03-11-2022 | Approval of changes in the TA budget for the Cross-border Cooperation Programme Poland-Belarus-Ukraine 2014-2020 |
44. | 28-10-2022 | 03-11-2022 | Approval of changes in the project PLBU.03.01.00-18-0668/17-00 - additional actions supporting Ukraine |
45. | 10-11-2022 | 16.11.2022 | Approval of changes in the project PLBU.03.01.00-18-0358/17-00 |
46. | 8-12-2022 | 13-12-2022 | Approval of the changes in the project PLBU.03.01.00-18-0358/17-00 |
47. | 16-12-2022 | 21-12-2022 | Approval of the changes in the project PLBU.01.02.00-18-0677/17-00 |
48. | 16-12-2022 | 23-12-2022 | Approval of Minutes from the 7th meeting of the JMC of the ENI Cross-border Cooperation Programme Poland-Belarus-Ukraine 2014-2020 |
49. | 19-12-2022 | 22-12-2022 | Approval of the changes in the project PLBU.01.02.00-18-0469/17-00 - project prolongation |
50. | 27-12-2022 | 30-12-2022 | Approval of changes in the project PLBU.01.02.00-20-02 |
2023
No. |
Start date |
Date of decision |
Subject |
1. | 29-12-2022 | 3-01-2023 | Approval of the changes in the project PLBU.01.02.00-20-0599/17-00 |
2. | 5-01-2023 | 11-01-2023 | Approval of changes in the LIP project no. PLBU.03.01.00-UA-0010/17 |
3. | 13-01-2023 | 18-01-2023 | Approval of changes in the project PLBU.01.01.00-14-0658/17-00 |
4. | 17-01-2023 | 23-01-2023 | Approval of the PBU Direct Award Application Package |
5. | 25-01-2023 | 30-01-2023 | Approval of direct award Concept Notes for Migratory Challenges & Solidarity Lanes |
6. |
07-02-2023 |
13-02-2023 |
Approval of the Annual Report of the ENI CBC Poland-Belarus-Ukraine Programme 2014-2020 for the period 1.07.2021 - 30.06.2022 |
7. |
08-02-2023 |
13-02-2023 |
Approval of Supplement to the Programme Manuals related to suspension of the Financing Agreement and introduction of Regulation (EU) 2022/2192 |
8. |
10-02-2023 |
15-02-2023 |
Changes in the project no. PLBU.01.01.00-UA-1073/20 |
9. |
16-03-2023 |
21-03-2023 |
Approval of changes in the project No PLBU.01.01.00-18-0945/19 |
10. |
20-03-2023 |
23-03-2023 |
Approval of update of the Guidelines on Expenditure Verification v. 9 |
11. |
21-03-2023 |
24-03-2023 |
Approval of changes in the project PLBU.03.02.00-18-0508/17-00 - project prolongation |
12. |
27-03-2023 |
29-03-2023 |
Changes in the project no. PLBU.01.01.00-06-0195/17-00 |
13. |
30-03-2023 |
04-04-2023 |
Changes in the project PLBU.01.02.00-18-0677/17-00 |
14. |
30-03-2023 |
04-04-2023 |
Approval of continuation of the micro-projects No PLBU.01.01.00-06-0800/19 and PLBU.01.01.00-06-1033/20 on the Polish side |
15. |
15-06-2023 |
19-06-2023 |
Approval of changes in the LIP no. PLBU.03.02.00-UA-0008/17-00 |
16. |
19-06-2023 |
22-06-2023 |
Approval of changes in the project PLBU.03.01.00-18-0358/17-00 |
17. |
21-06-2023 |
26-06-2023 |
Approval of changes in the LIP no. PLBU.03.01.00-UA-0010/17-00 |
18. |
30-06-2023 |
05-07-2023 |
Approval of changes in the project PLBU.01.01.00-18-1100/20 |
19. |
04-07-2023 |
07-07-2023 |
Approval of changes in the project PLBU.01.02.00-18-0469/17-00 |
20. |
06-07-2023 |
11-07-2023 |
Approval of:
|
21. |
11-07-2023 |
14-07-2023 |
Approval of changes in project no. PLBU.03.02.00-UA-0754/17-00 |
22. |
21-07-2023 |
26-07-2023 |
Approval of the increase of the value of project no PLBU.03.01.00-06-1197/23-00 |
23. |
04-08-2023 |
09-08-2023 |
Approval of changes in project no PLBU.03.01.00-18-0668/17-00 |
24. |
12-09-2023 |
22-09-2023 |
JMC written procedure - JOP modification |
25. |
15-09-2023 |
20-09-2023 |
Written procedure on changes in the project no. PLBU.03.01.00-20-1200/23-00 |
26. |
5-12-2023 |
8-12-2023 |
Written procedure on changes in the project no. PLBU.01.01.00-18-0307/17-00 |
27. |
15-12-2023 |
20-12-2023 |
Approval of changes in the overall TA budget of the Programme and in TA sheet of the JTS and the Polish CCP for the years 2018-2024 |
28. |
21-12-2023 |
27-12-2023 |
Changes in the project no. PLBU.01.01.00-18-0499/17-00 - increase of the co-financing of the project |
29. |
21-12-2023 |
28-12-2023 |
Written procedure on approval of changes in the service contract PLBU.05.01.00-18-0003/17-00 |
30. |
21-12-2023 |
28-12-2023 |
Written procedure on approval of changes in the service contract PLBU.05.01.00-UA-0001/17-00 |
2024
No. |
Start date |
Date of decision |
Subject |
1. |
02.02.2024 |
12.02.2024 |
Approval of PBU 2014-2020 Annual implementation report 2022-2023 |
2. |
05.03.2024 |
12.03.2024 |
Transfer of decision making to MC PL-UA |
3. |
21.03.2024 |
26.03.2024 |
Approval of update of the Guidelines on Expenditure Verification v 1.0 |
4. |
25.03.2024 |
28.03.2023 |
Approval of changes in the service contract PLBU.05.01.00-18-0003/17-00 |
5. |
25.03.2024 |
28.03.2024 |
Approval of changes in the service contract PLBU.05.01.00-UA-0001/17-00 and in TA budget (PBU 2014-2020) |
6. |
16.04.2024 |
19.04.2024 |
Approval of modifications to the Supplement to the Programme Manuals |
7. |
30.04.2024 |
14.05.2024 |
Approval of minutes: 4th MC meeting Interreg Next Poland - Ukraine 2021-2027/ 8th JMC P(B)U 2014-2020 |
8. |
14.05.2024 |
17.05.2024 |
Approval of changes in the service contract PLBU.05.01.00-UA-0001/17-00 within PBU 2014-2020 |
Was this page useful?